Heavy Engineering · Since 1949
Liebherr crawler crane lifting precast segment on high-rise site
Liebherr Cranes · Since 1949

Liebherr Crane Fleets Engineered for High-Rise and Heavy Lift Sites

Tower, crawler and mobile cranes with published boom load charts, ASME B30 / ISO 4301 classification data and EPA Tier 4 Final powertrains — supported by regional parts hubs across 130 countries.

Configuration by Jobsite Workflow

Match boom length, lifting capacity, track shoe width and bucket capacity to the duty cycle your EPC or quarry superintendent actually runs.

Bucket capacity1.4–2.2 m³ general-purpose or heavy-duty
Track shoe width600–700 mm triple-grouser for soft haul roads
Digging depth6.5–7.8 m on mid-class crawler excavators
Hydraulic system pressureMain circuit tuned for ISO 4406 cleanliness targets
Bucket1.2 m³ heavy-duty rock with reinforced cutting edge
AttachmentHydraulic breaker / quick hitch ready
Ground pressureRock-spec shoes to limit undercarriage wear
Breakout forceSpecified for face loading into rigid haul trucks
Boom lengthLattice main up to 60 m + jib options to 18 m
Lifting capacity @ 12 mPublished SWL per ASME B30 load chart
Hoist speedVariable line speed with anti-two-block lockout
Slewing speedLoad-moment indicator with lift planner package
Mat / pour supportWheel loaders and dozers sized for MTV feed rates
Compaction forceFleet pairing guidance for tandem rollers
Operating weightSelected for gradeability on binder courses
EmissionsEPA Tier 4 Final / EU Stage V power packs

Engineering Capabilities That Hold Under Load

Four systems EPC engineers audit before awarding a crane or earthmoving package.

Liebherr hydraulic main pump assembly

Hydraulic Circuits Held to ISO 4406 Cleanliness

Main pumps, pilot pressure circuits and slew drives are factory flushed and sampled so particle counts stay inside the band your reliability engineer specifies. On commissioning we log cleanliness trends into the service portal alongside operating weight and duty-cycle hours.

Tier 4 Final engine bay on Liebherr excavator

EPA Tier 4 Final / EU Stage V Powertrains

DPF and SCR aftertreatment packages are validated on ISO 8178 C1 cycles before shipment. Cab DEF alarms and NOx logs travel with every machine so project EHS officers can close emissions audits without chasing paper across borders.

Crawler undercarriage track group

Undercarriage Groups Sized for Rebuild Intervals

Track shoes, idlers, sprockets and final drives are specified for multi-thousand-hour rebuild cycles common on quarry and infrastructure fleets. Drop-in geometry keeps downtime predictable when your workshop rotates a travel motor overnight.

Field service engineer inspecting crane boom pin

Global Service Network for Crane Re-Certification

AS 2550 / ASME B30 boom pin NDT, anti-two-block functional tests and load-chart reissues are available through regional hubs. Mean-time-to-repair targets are written into framework agreements for contracted sites.

12,000+Machines shipped per year
130Countries with on-site support
5,200Engineering & production staff
8,000hTypical major-component overhaul cycle

FAQ by Workflow

Earthmoving

How do you set bucket fill factor for clay versus aggregate?

Clay typically runs 110–115% fill; blasted aggregate closer to 90–95%. We tune cycle time and hydraulic system pressure during commissioning against your haul-truck match.

What digging depth range covers mid-class crawler excavators?

Most mid-class units deliver roughly 6.5–7.8 m digging depth with standard boom/stick; long-reach kits are quoted when trench or canal profiles demand it.

Crane Lift

Is anti-two-block standard on Liebherr cranes?

Yes. Every crane leaves the factory with anti-two-block, load-moment indication and documentation aligned to ASME B30 / ISO 4301 classification requirements for the sold configuration.

Can you reissue boom load charts after a jib change?

Field engineers perform pin-gauge checks, jib clearance verification and chart reissue so the SWL at each radius stays legally current for the new configuration.

Aftermarket Parts

What warranty covers OEM-equivalent track shoes?

Undercarriage wear parts ship with hour-or-month warranties documented on the packing list; regional hubs stock sprockets, idlers and cutting edges for common operating weights.

How fast can hydraulic hoses and filters reach a remote quarry?

Contracted sites target sub-18-hour mean-time-to-repair via the nearest parts hub; critical kits can air-freight when the framework agreement includes expedited logistics.

Resource Library

Spec sheets, boom load charts and emissions audit packs for procurement and lift-planning teams.

Spec Sheets
Boom Load Charts
Emissions & Safety Reports

Send Specs to the Liebherr Field Team

Share lift radius, boom length, operating weight targets or quarry cycle data. Application engineers return a configuration recommendation with chart references inside two working days.

  • EPA Tier 4 Final / EU Stage V certified across crawler, wheel and crane ranges
  • Regional parts hubs stocking undercarriage and hydraulic kits
  • ASME B30 / AS 2550 boom load chart re-certification support
  • ISO 9001 and ISO 45001 documented manufacturing controls

Request a Quote